Water Meter Installation
- Oaklawn Park
- Mar 23
- 1 min read
The new water meter installation is happening. If you haven't already signed up for a time, please be sure to do so. Information and links to sign up for installation were sent out by Focus. You can also find and scan the links to sign up by each of the two mailbox areas.
It will be vital that each of the 167 units has an individual meter installed. Installation ends with the end of March 2026.
Kyle Thompson



Comments